Logistics challenge:
All materials, machinery and the MuoviPort chamber had to be transported by passenger train and lifted with extreme care due to access limitations.
Proper anchoring and concrete base are essential when installing large manifold chambers in areas with groundwater presence.
Final result:
Fully operational geothermal system
52 boreholes connected
0% visual impact after restoration
Long-term, sustainable energy solution
Estimated CO2 reduction:
~270–300 tCO2/year (vs diesel boiler, 500 kW, 2,500 h/y, COP 4.5; Spain grid factor 0.25 kgCO2/kWh).
With 100% renewable electricity contract:
Up to ~330–370 tCO2/year (market-based).